Who owns the model, and who can rely on it

Sharing a model is not the same as giving it away, or guaranteeing it. Learn the three questions every contract should answer: who owns it, who may use it, and who may rely on it.

With Kai, site manager3 min read3 quiz questions
Skip to the quiz
  • Watch out
  • What it costs
  • Experienced readers
  • Remember
  • In BIMpedia
Kaisite manager
Even if you do this every day, watch for this: The status code is a statement of purpose. 'Shared for information' tells everyone they may look, not rely. Check the status before you take anything from someone else's model.

Models move freely on a project: uploaded, federated, downloaded, measured, copied into other tools. That ease hides three questions that the contract, not the software, answers. Who owns the model? Who may use it, and for what? Who may rely on it, and for what?

Basics
  • Ownership (intellectual property, often copyright) usually stays with the author: the architect owns the architect's design.
  • A licence lets others use it for stated purposes, such as building and maintaining this project.
  • Reliance means you may act on the information and hold its author responsible if it is wrong, within the purpose for which it was issued.
Story · Quantities from a model shared for information
How it goes wrong

The contractor's buyer downloads the architect's model from the CDE, takes the internal wall areas and orders plasterboard. The model was at "S2, for information": the walls were still being developed. The order is 12% short. The contractor asks the architect to pay for the extra delivery; the architect points to the status code.

How it goes right

The BEP and the appointments state which models may be relied on for quantities, and from which status. The buyer checks: walls are issued for construction (status A) only next month. They order the long-lead items now from the cost plan and the plasterboard from the issued model later.

The three questions

QuestionUsual answerWhere it is written
Who owns it?The author keeps the intellectual propertyEach appointment
Who may use it?Others get a licence for the project's purposes (design, construction, operation)Appointment, information protocol
Who may rely on it?Anyone, for the purpose and status it was issued forAppointment, BEP, status codes
Kaisite manager
Your turn. Give it about 10 min and work it out on your own before you open the model answer: that is where it sticks.
Exercise: Can they use it? 10 min

Decide each case.

Check yourself

Can they use it?

Usual appointments: authors keep ownership and license the project team and client for this project. Decide each case.

  • Contractor measures a model issued for construction, to build this project
  • Client reuses the design model for a different building
  • Facility manager uses the as-built model to run the building
  • Subcontractor fixes an error directly in the architect’s model

Key takeaways

  • Ownership, licence to use and reliance are three different questions; contracts should answer each.
  • Usually the author keeps the intellectual property and grants others a licence for the project's purposes.
  • You can rely only on what the contract says you can: check the status and the stated purpose before using a model.
  • Each party is responsible for its own model; the federated model doesn't move that responsibility.

Your notes

Check yourself

3 questions · 2 right to complete
  1. 1. The contractor takes quantities from the architect's shared model for an order. They turn out to be wrong. The model was shared at status 'S2, for information'. Who carries the risk?
  2. 2. At the end of the project, the client wants to use the design model to plan a future extension with a different architect. What decides whether they can?
  3. 3. The MEP engineer adjusts the structural model's slab openings to fit their ducts, to save time. What is wrong?
0 of 3 answered