Quantities and cost (5D)

Can the estimator trust quantities from the model?

Model quantities are fast and update with the design, but only if elements are classified, measured the way cost rules expect, and free of duplicates. Here's what estimators need from your model.

How it works

The process, at a glance

From model to estimate
  1. 1
    Classify

    Every measured element carries a classification code

    Output: Classified model

    Gate: No unclassified elements in measured categories
  2. 2
    Extract

    Quantities per type: count, length, area, volume

    Output: Quantity table

    Gate: Duplicates between models removed
  3. 3
    Map

    Types to cost items by classification

    Output: Measured items

    Gate: Every type mapped, net and gross stated
  4. 4
    Price

    Rates per cost item

    Output: Priced items

    Gate: Rates current, source stated
  5. 5
    CompleteMandatory

    Add what the model can’t give: preliminaries, risk, unmodelled items

    Output: Estimate

    Gate: Report says what came from the model and what didn’t

Each step has an output and a check. The estimate is only as good as the weakest gate.

Common mistakes

What goes wrong most often on real projects.

  • Pricing schedule totals without checking scope and duplicates.
  • Mapping types to cost items by name instead of by classification.
  • Mixing net and gross quantities.
  • Presenting a model-based estimate as complete when it only covers modelled work.

Is it in place on your project?