Your weekly documents, generated
Generate, check and track the documents you work with every week, with your project details, logo and document numbers. Export to Excel, PDF or Word.
Free. No sign-up. Your work stays in your browser until you export it.
Set up the project
Plans, roles, deliverables and coordinates agreed at the start.
EIR Builder
Use it when you write the client’s requirements, or to check a tender BEP against them.
Write the client’s exchange information requirements as a register and check the BEP answers each one.
BEP Builder
Use it when you need to write or update the BIM execution plan.
Assemble a BIM execution plan from editable sections, with your tool outputs as appendices.
Responsibility Matrix
Use it to agree who does what for information management.
Who is responsible, accountable, consulted and informed for each information management task.
TIDP / MIDP Planner
Use it to plan which documents and models each team delivers, and when.
Plan every information deliverable per task team, with document numbers and milestones, and roll up the MIDP.
Georeferencing Sheet
Use it to agree coordinates and check the model sits in the right place.
Coordinate system, base points and survey control, with a best-fit check and IfcMapConversion values.
Coordinate Converter
Use it when survey, GIS and model coordinates are in different systems, or you need true north for the model.
Convert points between coordinate reference systems by EPSG code, with convergence and scale factor.
Numbering Rule Builder
Use it when you agree room, sheet or asset numbering, or need to renumber consistently.
Define how rooms, sheets or assets are numbered and preview every new number.
Define requirements
How developed elements must be, what data they carry and how they are checked.
LOD / LOIN Matrix
Use it to agree how developed each element must be at each stage.
Set the level of development per element and stage, with responsibilities and information requirements.
IDS Builder
Use it to turn information requirements into a file software can check.
Write information requirements as a machine-checkable IDS file — or generate them from your LOD/LOIN matrix.
Shared Parameter Manager
Use it when you set up the project’s Revit parameters so they match the information requirements.
Build and check a Revit shared parameter file, and the matching IFC property set mapping.
Clash Test Matrix
Use it at the start of coordination to decide which clash tests to run.
Define which disciplines are tested against each other, with tolerances, priorities and owners.
Coordinate every week
Meetings, clash results, issues and questions — the weekly loop.
Coordination Meeting Pack
Use it every week: agenda, attendance, issue log, actions and minutes.
Agenda, attendance, issue log, actions and minutes. Roll open issues into the next meeting.
Delivery Tracker
Use it every week to report delivery progress to the project team and the client.
A one-page weekly delivery report from your MIDP, issues, RFIs and model QA, with a trend.
Clash Report Importer
Use it after a clash run to turn thousands of clashes into a few issues.
Turn a Navisworks clash report into a short list of grouped issues, then send them to the Meeting Pack.
BCF Viewer & Exporter
Use it to read issues from BIM tools, or send your issues back to them.
Open a .bcfzip to review topics and snapshots, import them as issues, or export your issue log as BCF.
RFI Register
Use it to track questions sent to the design team until they are answered.
Numbered requests for information with due dates, responses, impacts and an overdue watch.
Drawing Register and Transmittals
Use it whenever drawings are issued, so everyone knows which revision went to whom.
Keep the drawing list with revisions and status, check numbers, and issue transmittals.
Check models and files
Check information before you share it or accept it.
IDS Checker
Use it when a model arrives and you need to know if it meets the agreed information requirements.
Check an IFC model against an IDS file and see which elements fail, and why.
IFC Inspector
Use it when you receive an IFC file, before you federate or share it.
Open an IFC file in the browser: structure, elements, properties and required-property checks.
Model Compare
Use it when a new model version arrives and you need to know what changed since last week.
See what changed between two versions of an IFC model.
3D IFC Viewer
Use it to look at a model without installing software, or to show where requirements fail.
View an IFC model in 3D and colour it by class, property or IDS results.
IFC to Excel Schedules
Use it when you need quantities, a door or equipment schedule, or a property review from an IFC model in Excel.
Export element properties from an IFC model to a formatted Excel schedule.
Model QA Checklist
Use it each cycle to record whether each team’s model passes the agreed checks.
Pass/fail checks per discipline before models are shared — a record for every coordination cycle.
ISO 19650 Naming Validator
Use it to check file names before they go into the CDE.
Check file and container names against your project's naming convention, field by field.
Type Name Checker
Use it to tidy family and type names before a model is shared or a library is published.
Check family and type names against your naming rule and build a rename table.
Hand over
Asset information for the people who will run the building.
COBie Checker
Use it before handover to check the asset data spreadsheet.
Check a COBie workbook for missing sheets, blank values, duplicates and broken references.
Snag and Punch List
Use it during inspections and before handover to record and close out defects.
Record site defects by location and trade, with photos, and track them to closed.
Coming next
Full roadmap →Information management assignment matrix
PlannedList every information management activity and say which party does it, checks it or is informed, as a grid you can export to Excel and attach to the appointment.
Information Protocol builder
PlannedWrite the information protocol that sits in each appointment (responsibilities, use of information, licences, liabilities), linked to the EIR and BEP you already have in the project.
Model handoff note
PlannedA short cover note that travels with a model: what it is for, what it may and may not be used for, how far each part can be relied on, open actions and what changed since the last issue (read from Model Compare and the IDS results).
Federation strategy builder
PlannedDecide how the project is split into models (by discipline, zone and level), what each federated view contains and how often it is produced, and export it as a BEP appendix.
4D schedule linker
PlannedOpen a Primavera P6 (.xer) or MS Project (.xml) schedule and an IFC model, link activities to elements with rules you can read, flag unlinked activities and impossible build orders, write the dates back into the IFC and play the sequence in the 3D viewer.
BIM use-case planner
PlannedPick the BIM uses the project needs and see the roles, effort and software each one takes, ready for a proposal or the BEP’s goals section.
The project journey
Find your stage, then the job. Every stop opens a tool.
- 1
- 2
- 3
- 4
- 5
How the tools connect
One tool’s output is often the next tool’s input.
Arrows show where one tool’s output feeds another. Click any tool to open it.