Skip to content
Topics
Learn
Tools
Pedia
Forum
Search
⌘K
Workspace
Home
/
Tools
/
Set up the project
/
Georeferencing Sheet
Georeferencing Sheet
Record the coordinate system, base points and survey control in one sheet. Enter control points in both systems to check the model’s position and get IfcMapConversion values.
Discussion
Open on the forum ↗