Skip to content
BIMpedia
TrackIntermediate to advanced

Information Manager (ISO 19650)

For the people who set up and run information management on a project: what the function is, who the parties are, how requirements are set, how teams are tendered and appointed, and how information is planned, produced, checked and handed over. Written in our own words from the ISO 19650 series and the UK guidance that supports it.

5 chapters · 8 lessons · about 48 minutes
Your progress0 of 8 lessons

Finish all 8 lessons to download a certificate of completion.

  1. Chapter 1. The job and the people

    0/2 done
  2. Chapter 2. Setting requirements

    0/3 done
  3. Chapter 3. Tender and appointment

    0/3 done
  4. Chapter 4. Planning and production

    Coming soon
    • 4.1 Federation strategy and breakdown structure Coming soonSplitting the project into models and containers that teams can own.
    • 4.2 Container metadata: status, revision and classification Coming soonThe attributes that say what a file is, how far it can be trusted and where it belongs.
    • 4.3 Review, authorisation and acceptance Coming soonThe three decisions between a team’s check and the client’s acceptance.
    • 4.4 Mobilisation Coming soonTesting people, IT and methods before the first deliverable is due.
  5. Chapter 5. Beyond delivery

    Coming soon
    • 5.1 Security-minded information management Coming soonWhen a project needs ISO 19650-5, and what changes if it does.
    • 5.2 The operational phase Coming soonAsset information requirements and the asset information model under ISO 19650-3.
    • 5.3 Health and safety information through the project Coming soonKeeping safety information findable from design to demolition.
    • 5.4 Soft landings Coming soonPlanning handover and the first years of operation with the people who will run the asset.

Your learning route

Each station is a chapter; completed lessons are ticked.

  1. 1
  2. 2
  3. 3
  4. 4
    Planning and productionChapter 4 · 0 lessons · 4 coming soon
    • Federation strategy and breakdown structureComing soon
    • Container metadata: status, revision and classificationComing soon
    • Review, authorisation and acceptanceComing soon
    • MobilisationComing soon
  5. 5
    Beyond deliveryChapter 5 · 0 lessons · 4 coming soon
    • Security-minded information managementComing soon
    • The operational phaseComing soon
    • Health and safety information through the projectComing soon
    • Soft landingsComing soon