Handover and asset information

Will the people who run the building get the data they need?

Asset information is planned from the start, filled in as the design develops and checked before handover — not collected in a rush at the end.

How it works

The process, at a glance

Asset information, from requirement to handover
  1. 1Asset requirementsWhat operations needs
  2. 3Data in the modelsFilled as design develops
  3. 4COBie exportSpreadsheet or IFC

Common mistakes

What goes wrong most often on real projects.

  • Collecting asset data only at the end of construction.
  • Spreadsheets full of placeholders such as n/a or TBC.
  • Components linked to types or spaces that don’t exist.

Is it in place on your project?

Tick what is done — it counts towards the checkpoint on your learning path.

0 / 4 in place