What’s live, and what’s next
Every tool, lesson, Pedia entry and feature on BIMpedia, plus what we are building next. Filter by type, status or topic, group the list, and open anything that is live.
Missing something? Suggest it on the forum.
| 3D IFC Viewer Open an IFC model in 3D in the browser, colour it by IFC class, by any property value or by IDS check results, click elements to read their data, and export the view with its legend. | Tool | Live | Released | Check | |
| Animated process diagrams Flowcharts, cycles, mind maps and roadmaps that explain each process. | Feature | Live | Released | Whole site | — |
| Asset data template from LOIN Generate an empty COBie-style workbook from the asset information required in the LOD matrix. | Feature | Live | Released | Handover | |
| Asset information at handoverDraft Asset data is planned at the start, filled in as the design develops and checked at every milestone — not collected in a rush at practical completion. | Lesson | Live | Released | Handover | |
| BCF (BIM Collaboration Format)Draft An open format from buildingSMART for exchanging model-based issues — with viewpoints, comments and element references — between BIM tools. | Pedia | Live | Released | Coordinate | |
| BCF Viewer & Exporter Review BCF topics, comments and snapshots in the browser, import them into the Meeting Pack issue log, and export any meeting's issue log as a BCF 2.1 file. | Tool | Live | Released | Coordinate | |
| BEP (BIM execution plan)Draft The delivery team's plan for how it will meet the client's information requirements — people, process, standards and tools. | Pedia | Live | Released | Set up | |
| BEP Builder Write a BIM execution plan from editable, pre-written sections that pull in your project profile, and attach your clash matrix, LOD matrix, naming rules, MIDP and more as appendices. Export to Word or PDF. | Tool | Live | Released | Set up | |
| BIM execution plan and roles How will our team deliver the information the client asked for? | Topic hub | Live | Released | Set up | |
| Board and timeline views See TIDP deliverables and RFIs as a Kanban board or along a timeline, not only as a table. The timeline has a month / quarter / all range, a two-row date axis, today marked, weekends shaded, and planned, late and done items told apart by word and pattern, not only colour. | Feature | Live | Released | Set up | |
| Capability and capacityDraft Before you promise a delivery plan, check that your team knows how to deliver it, has the hours to do it, and has the IT to do it with. | Lesson | Live | Released | Set up | |
| CDE (common data environment)Draft The agreed source of project information, with a workflow that moves containers through work in progress, shared, published and archived. | Pedia | Live | Released | Set up | |
| Checking an IFC file before you share itDraft Five minutes of checks on an IFC export saves a week of confusion in the federated model. | Lesson | Live | Released | Check | |
| Checking models and data Is this model good enough to share or accept? | Topic hub | Live | Released | Check | |
| Clash coordination How do we find the clashes that matter — and get them fixed? | Topic hub | Live | Released | Coordinate | |
| Clash detection types (hard, clearance, duplicate)Draft The three main kinds of clash test, what each finds, and how tolerances change the results. | Pedia | Live | Released | Coordinate | |
| Clash Report Importer Import a Navisworks XML clash report or a CSV, group thousands of clash points by test, level and grid, and send the groups to your coordination issue log. Export Excel, PDF or Word. | Tool | Live | Released | Coordinate | |
| Clash Test Matrix Build the clash test matrix you issue at the start of coordination: discipline pairs, clash type, tolerance, priority and who resolves. Export to Excel and PDF with your project details. | Tool | Live | Released | Requirements | |
| Clashes and BCF topics in the 3D viewer Show clash results or BCF topics on the model: the elements involved are highlighted and the camera zooms to them. | Feature | Live | Released | Coordinate | |
| Clearer status, numbers and next steps Numbers that count up, status chips that always carry a word, a “do this next” card in Project health, dated “Coming up” rows, and a table behind every chart. | Feature | Live | Released | Set up | |
| COBieDraft Construction Operations Building information exchange — a structured format for handing over asset information to the people who run the building. | Pedia | Live | Released | Handover | |
| COBie Checker Check a COBie spreadsheet before handover: required sheets and columns, blank and placeholder values, duplicate names and broken links between floors, spaces, types and components. | Tool | Live | Released | Handover | |
| Completion certificates A PDF certificate when you finish every lesson of a track, created in your browser (self-assessed, not accredited). | Learning | Live | Released | Whole site | — |
| Coordinate Converter Convert survey and model points between national grids, UTM zones and latitude/longitude by EPSG code, and get the grid convergence and scale factor at each point — in the browser. | Tool | Live | Released | Set up | |
| Coordinate reference systems and EPSG codesDraft What a CRS is, the difference between geographic and projected systems, and how EPSG codes identify them. | Pedia | Live | Released | Set up | |
| Coordinates and georeferencing Do all our models sit in the right place in the real world? | Topic hub | Live | Released | Set up | |
| Coordination Meeting Pack Run your weekly coordination loop: agenda, attendance, issue log, actions and minutes, with open issues carried into the next meeting automatically. | Tool | Live | Released | Coordinate | |
| Delivery planning (MIDP and TIDP) Who delivers which information, and when? | Topic hub | Live | Released | Set up | |
| Delivery Tracker Build the weekly delivery report automatically: deliverables shared and late, open and overdue issues and RFIs, model QA decisions and the last IDS check — by task team, with a trend over the weeks. | Tool | Live | Released | Coordinate | |
| Drawing Register and Transmittals A drawing register with current revision and status, drawing numbers checked against your naming convention, revisions raised in one click, and transmittals that record what was issued to whom. | Tool | Live | Released | Coordinate | |
| Edit IFC properties from Excel Edit values in the exported schedule, load it back, review the differences and download an updated IFC (in IFC to Excel Schedules). | Feature | Live | Released | Check | |
| EIR (exchange information requirements)Draft What the appointing party needs from an appointment — which information, when, in what form and why. | Pedia | Live | Released | Set up | |
| EIR Builder Write exchange information requirements as a clear register — requirement, purpose, milestone, format and acceptance test — and see which ones the BIM execution plan answers. | Tool | Live | Released | Set up | |
| EIR → BEP coverage check Match every EIR clause to a BEP section and see at a glance which requirements nobody has answered. | Feature | Live | Released | Set up | |
| EIR, BEP, MIDP and TIDP explainedDraft Four acronyms, one conversation. Requirements go down, plans come back up. | Lesson | Live | Released | Set up | |
| Excel, PDF and Word export Every tool exports a branded, numbered and revised document in three formats. | Feature | Live | Released | Whole site | — |
| Flashcards and quizzes Spaced flashcards and a short quiz at the end of every lesson, with progress kept in your browser. | Learning | Live | Released | Whole site | — |
| Forum discussions on pages Each lesson, Pedia entry and tool links to its own forum thread and shows the latest replies. | Community | Live | Released | Whole site | — |
| From organisational needs to exchange requirementsDraft OIR, AIR, PIR, EIR. Four sets of requirements, each built on the one before, ending in sentences a supplier can price and deliver. | Lesson | Live | Released | Set up | |
| GeoreferencingDraft Placing a model in a real-world coordinate reference system, so it lines up with surveys, GIS data and other models. | Pedia | Live | Released | Set up | |
| Georeferencing Sheet Record the coordinate reference system, project base point, survey point and control points, check the model's position with residuals, and get IfcMapConversion values. | Tool | Live | Released | Set up | |
| Handover and asset information Will the people who run the building get the data they need? | Topic hub | Live | Released | Handover | |
| IDS (Information Delivery Specification)Draft A buildingSMART standard for writing information requirements as a machine-readable file that software can check IFC models against. | Pedia | Live | Released | Check | |
| IDS Builder Build an IDS (Information Delivery Specification) file from specifications and requirements, generate it from your LOD/LOIN matrix, and send the rules to the IFC Inspector. | Tool | Live | Released | Requirements | |
| IDS check straight from the LOD matrix Check a model against the attributes required in the LOD/LOIN matrix, without building an IDS first. | Feature | Live | Released | Requirements | |
| IDS Checker Check an IFC model against buildingSMART IDS requirements in your browser: pass or fail for every specification, the failing elements with reasons, and issues sent to the Meeting Pack or as BCF. | Tool | Live | Released | Check | |
| IFC (Industry Foundation Classes)Draft The open, vendor-neutral data model for exchanging building and infrastructure information between software. | Pedia | Live | Released | Check | |
| IFC Inspector Inspect an IFC file in your browser without uploading it: spatial structure, elements, property sets, quality checks and required properties. Export a check report. | Tool | Live | Released | Check | |
| IFC to Excel Schedules Turn an IFC model into schedules: pick classes and properties, preview, and export a formatted workbook — one sheet per class or one sheet for everything — plus a PDF type schedule. | Tool | Live | Released | Check | |
| Information container namingDraft How ISO 19650-style file and container IDs are built from fields and codes, and what does not belong in the name. | Pedia | Live | Released | Set up | |
| Information management is a job, not a job titleDraft ISO 19650 does not ask for an “information manager”. It asks every party to make sure a set of activities gets done, by named people, before the work starts. | Lesson | Live | Released | Set up | |
| Interactive lesson format Lessons that teach by doing: a wrong-versus-right story, “Try it” widgets with the sample data, “Show me” tours that open the tool and point at each step, fixed callouts, a switch that folds the basics for experienced readers, and a reason under every quiz answer. Every lesson uses it. | Learning | Live | Released | Coordinate | |
| ISO 19650 and information requirements What does ISO 19650 actually ask of my project? | Topic hub | Live | Released | Set up | |
| ISO 19650 Naming Validator Paste file names or pick a folder and check every name against your project's ISO 19650-style naming convention. Export a validation report to Excel or PDF. | Tool | Live | Released | Check | |
| ISO 19650 overviewDraft A plain-language map of the ISO 19650 series — what each part covers and how it shapes a BIM project. | Pedia | Live | Released | Set up | |
| Learning path The whole site as one route: five units, each topic a run of lessons, tools to practise and a checkpoint, with XP, stars and progress. | Learning | Live | Released | Whole site | — |
| Level of information need (LOD / LOIN) How much detail and data does each element need, and when? | Topic hub | Live | Released | Requirements | |
| LOD / LOIN Matrix Define the level of development each model element must reach at each stage, who is responsible, and which attributes it must carry. Export to Excel and PDF. | Tool | Live | Released | Requirements | |
| LOD levels (100–500) explainedDraft What LOD 100, 200, 300, 350, 400 and 500 mean in practice, with a simple example for each. | Pedia | Live | Released | Requirements | |
| LOD Matrix → delivery plan Create TIDP deliverables for each discipline and milestone from the LOD matrix. | Feature | Live | Released | Requirements | |
| LOD Matrix → IDS rules Turn the attributes required in the LOD/LOIN matrix into IDS requirements with one click (in the IDS Builder). | Feature | Live | Released | Requirements | |
| LOD vs LOINDraft LOD describes how developed and reliable an element is. LOIN describes exactly what information is needed for a purpose. | Lesson | Live | Released | Requirements | |
| LOD vs LOINDraft LOD grades how developed and reliable an element is; LOIN defines the exact information a purpose needs. | Pedia | Live | Released | Requirements | |
| Meetings, issues and RFIs How do we run the weekly loop so issues actually close? | Topic hub | Live | Released | Coordinate | |
| MIDP and TIDPDraft The delivery plans that say who will deliver which information containers, and when. | Pedia | Live | Released | Set up | |
| Model checkingDraft Rule-based checks of model quality, information and coordination — from naming and structure to clashes and required properties. | Pedia | Live | Released | Check | |
| Model Compare Compare two versions of an IFC model by GlobalId: elements added and removed, and every changed name, storey, type, property, classification and material — with the most frequent changes summarised. | Tool | Live | Released | Check | |
| Model federationDraft Combining discipline models into one coordinated view while each team keeps ownership of its own model. | Pedia | Live | Released | Coordinate | |
| Model QA Checklist Check each discipline's model against a short QA checklist before it is shared, record the decision per cycle, and export the sign-off sheet. | Tool | Live | Released | Check | |
| Naming and the common data environment How do we name, share and approve files so everyone trusts them? | Topic hub | Live | Released | Set up | |
| Naming information containersDraft A good naming convention makes every file findable, sortable and checkable by a machine. Here is how the fields fit together. | Lesson | Live | Released | Set up | |
| Numbering Rule Builder Build a numbering rule for rooms, sheets or assets — pattern, start, step, restart per level or zone — preview the result, catch duplicates and export old and new numbers. | Tool | Live | Released | Set up | |
| OmniClassDraft A North American classification system with numbered tables for entities, spaces, elements, work results, products and more. | Pedia | Live | Released | Requirements | |
| One look with the forum Index pages share the forum’s layout (a centred welcome band, a side list of sections with one main action) and every lesson, Pedia entry, tool and topic opens with a coloured header and tag chips, like a forum discussion. | Feature | Live | Released | Whole site | — |
| Parties, teams and appointmentsDraft Appointing party, lead appointed party, appointed party; project team, delivery team, task team. Who is who depends on who appointed whom, and it can change mid-project. | Lesson | Live | Released | Set up | |
| Project health One panel in the Workspace that reads every document in the project: EIR coverage, late deliverables, overdue issues and RFIs, model QA, IDS results, snags, and documents never issued. | Feature | Live | Released | Whole site | — |
| Project profile Project name, number, logo and parties used on every export; back up or move a project as a .json file. | Feature | Live | Released | Whole site | — |
| Project template files Save your naming rules, LOD matrix, BEP, clash matrix and RACI as one template file and start new projects from it. | Feature | Live | Released | Whole site | — |
| Responsibility Matrix Agree who does what for information management with a RACI matrix pre-filled with common ISO 19650 tasks. Flags tasks without exactly one accountable party. | Tool | Live | Released | Set up | |
| RFI Register Track requests for information from question to answer: numbering, addressees, due dates, responses, cost and time impact. Export the register or a single RFI form. | Tool | Live | Released | Coordinate | |
| Roadmap This list: everything built and everything planned. | Feature | Live | Released | Whole site | — |
| Running a coordination meetingDraft A good coordination meeting is short, visual and ends with decisions that have owners and dates. | Lesson | Live | Released | Coordinate | |
| Setting up clash tests that matterDraft Ten thousand clashes help nobody. A good test matrix produces a short list of real problems with a clear owner. | Lesson | Live | Released | Coordinate | |
| Shared coordinates and georeferencingDraft Models only line up if everyone agrees where zero is. Georeferencing ties that zero to the real world. | Lesson | Live | Released | Set up | |
| Shared Parameter Manager Create, import and check Revit shared parameter files with stable GUIDs — started from your LOD matrix or IDS — and download the IFC property set mapping for the Revit IFC exporter. | Tool | Live | Released | Requirements | |
| Simpler navigation and community message Five sections with one job each, named the same everywhere; breadcrumbs that start at Home and follow the address; what you can ask the community for, on every section. | Feature | Live | Released | Whole site | — |
| Site search One search box across topics, tools, lessons and Pedia entries (press / or Ctrl K). | Feature | Live | Released | Whole site | — |
| Snag and Punch List Record defects on site from your phone — location, trade, priority and a photo — move them from open to closed on a board, and export the list with photos for the contractor. | Tool | Live | Released | Handover | |
| Swimlane and gated-step diagrams Two new diagram types: who does what, with a handoff pill wherever work changes hands, and numbered steps that each show their output and the gate to pass before the next step. | Feature | Live | Released | Set up | |
| Text size option A button in the header makes the whole site larger (two steps), remembered in your browser. | Feature | Live | Released | Whole site | — |
| The CDE and its statesDraft Work in progress, shared, published and archived. Each state is a promise about how far you can trust the information. | Lesson | Live | Released | Set up | |
| The detailed responsibility matrixDraft Two kinds of matrix, two levels of detail. At appointment, “the architect does architecture” becomes “who produces which information, by which milestone, for which requirement”. | Lesson | Live | Released | Set up | |
| The information protocolDraft Requirements, standards and plans only bind anyone when an appointment says so. The information protocol is the part of each appointment that does. | Lesson | Live | Released | Set up | |
| The information standard, methods and shared resourcesDraft Before anyone is appointed, the client sets the project-wide rules every team will work to, and the files every team will start from. | Lesson | Live | Released | Set up | |
| The pre-appointment BEP and the tender responseDraft A tender response proves the team understood the requirements and can deliver them. The BEP is one of four parts, and the one most often written from a template. | Lesson | Live | Released | Set up | |
| TIDP / MIDP Planner Plan information deliverables per task team (TIDP), with automatic container IDs, milestones and status, and roll them up into the master information delivery plan (MIDP). | Tool | Live | Released | Set up | |
| Topic hubs Ten landing pages — Understand, Learn, Do — that tie each subject’s lesson, Pedia entry and tools together. | Feature | Live | Released | Whole site | — |
| Tracking issues to closureDraft An issue log is only useful if every issue moves towards closed, and everyone agrees what closed means. | Lesson | Live | Released | Coordinate | |
| Type Name Checker Check family and type names — pasted or read from an IFC model — against a field-by-field naming rule, get suggested fixes and download a rename table. | Tool | Live | Released | Check | |
| UniclassDraft The UK's unified classification system for the built environment, organised in tables for everything from complexes to products. | Pedia | Live | Released | Requirements | |
| What ISO 19650 asks of a project teamDraft ISO 19650 is less about software and more about agreeing who needs what information, when, and in what form. | Lesson | Live | Released | Set up | |
| Workspace Your projects and documents in one place, with progress along the project stages. | Feature | Live | Released | Whole site | — |
| Writing an LOD matrix your team will useDraft Short, specific and owned. A practical way to build an LOD matrix that survives contact with the project. | Lesson | Live | Released | Requirements | |
| Writing IDS requirements and reading the resultsDraft Turn “the model must contain fire ratings” into a rule software can check — and know what a pass or fail actually tells you. | Lesson | Live | Released | Requirements | |
| Information Manager track (ISO 19650) A second track for information managers. Live: the information management function, parties and teams, from needs to exchange requirements, the information standard and methods, the information protocol, capability and capacity, the tender response, the detailed responsibility matrix. Next: federation strategy, container metadata, review and acceptance, mobilisation, security (ISO 19650-5), the operational phase (ISO 19650-3), health and safety information, soft landings. | Learning | In progress | Now | Set up | |
| 4D schedule linker Open a Primavera P6 (.xer) or MS Project (.xml) schedule and an IFC model, link activities to elements with rules you can read, flag unlinked activities and impossible build orders, write the dates back into the IFC and play the sequence in the 3D viewer. | Tool | Planned | Next | Set up | |
| Authoring template setup checklist A checklist for setting up a project template, with starting presets for Revit and Civil 3D: units, coordinates, parameters, view templates, export settings. | Tool | Planned | Later | Check | |
| BEP Builder: new structure and a pre-issue check Ten clear sections (project, roles, goals and use cases, technology, deliverables, standards and methods, collaboration, quality, risks, appendices), a polished cover and numbered tables in PDF and Word, a letter-chip RACI, and a check that flags empty sections, unanswered requirements and placeholder text before you issue. | Feature | Planned | Next | Set up | |
| BIM use-case planner Pick the BIM uses the project needs and see the roles, effort and software each one takes, ready for a proposal or the BEP’s goals section. | Tool | Planned | Later | Set up | |
| CDE audit checklist About 35 checks in seven phases, with critical items, pass or fail, evidence and comments, and a dated audit report. | Tool | Planned | Later | Set up | |
| Distribution matrix in the Drawing Register Say which party receives which kind of document, and let transmittals fill in their recipients from it. | Feature | Planned | Later | Set up | |
| Federation strategy builder Decide how the project is split into models (by discipline, zone and level), what each federated view contains and how often it is produced, and export it as a BEP appendix. | Tool | Planned | Next | Coordinate | |
| Forum sign-in and replies on pages Sign in with your forum account and reply from any lesson, Pedia entry or tool. Needs the site live on bimpedia.org next to the forum (same origin), so it follows the first deployment. | Community | Planned | Later | Whole site | — |
| Information management assignment matrix List every information management activity and say which party does it, checks it or is informed, as a grid you can export to Excel and attach to the appointment. | Tool | Planned | Next | Set up | |
| Information Protocol builder Write the information protocol that sits in each appointment (responsibilities, use of information, licences, liabilities), linked to the EIR and BEP you already have in the project. | Tool | Planned | Next | Set up | |
| Infrastructure presets for the LOD matrix Starter element lists for bridges, rail, tunnels, earthworks and utilities, so the LOD matrix works beyond buildings. | Feature | Planned | Later | Requirements | |
| Lessons on IFC export and quantities How to set up and check IFC exports from the main authoring tools, and how to take reliable quantities from models. | Learning | Planned | Later | Check | |
| Model handoff note A short cover note that travels with a model: what it is for, what it may and may not be used for, how far each part can be relied on, open actions and what changed since the last issue (read from Model Compare and the IDS results). | Tool | Planned | Next | Check | |
| Model health score Model QA becomes a scored dashboard: areas (drawings vs model, geometry and LOD, information, quantities, technical health), critical gates that fail a model outright, acceptance rate per discipline and a trend over time. | Feature | Planned | Next | Check | |
| Review comment sheet Collect review comments on an issued document or model, with responses and close-out, linked to the Drawing Register’s transmittals. | Tool | Planned | Later | Set up | |
| buildingSMART Data Dictionary lookup Search bSDD classes and properties from the LOD matrix and IDS Builder. Waiting on buildingSMART: the bSDD API only answers browsers on buildingSMART’s own sites, and BIMpedia will not add a server to relay it. | Feature | Idea | Later | Requirements | |
| Security triage Answer the questions behind ISO 19650-5 to decide whether a project needs a security-minded approach, and record the outcome. | Tool | Idea | Later | Set up | |
| Soft landings checklist Plan the handover and the first months of operation stage by stage, so the people who run the building get what they need. | Tool | Idea | Later | Handover | |