EIR (exchange information requirements)

What the client needs from an appointment — which information, in what form, at which milestones — written so the delivery team can plan and price it.
Updated 5 November 2026Draft · awaiting review

Exchange information requirements (EIR) set out what information an appointing party needs from an appointed party: what it is, what it is for, in which format and level of detail, and when it must be delivered. In ISO 19650 every appointment has its own EIR. Before ISO 19650, the UK used "employer's information requirements" with the same abbreviation.

At a glance

Written byThe appointing party (client) for its lead appointed parties; lead appointed parties for their own appointments
Derived fromOrganisational, project and asset information requirements (OIR, PIR, AIR)
Answered byThe BIM execution plan (BEP)
Part ofThe tender documents and then the appointment
Defined inISO 19650-1 and -2

Where an EIR comes from

The client's organisation has strategic needs (OIR). A project serves some of them (PIR), and the finished asset must be operated (AIR). The EIR turns these into specific deliverables for one appointment.

How information requirements cascade into delivery plans
OIROrganisational needs
AIRAsset needs
PIRProject needs
DeliveryAt agreed milestones

Requirements flow from the client’s needs into the EIR; the delivery team answers with the BEP and delivery plans.

What an EIR usually contains

Information requirements

  • the purpose of each piece of information (design approval, cost planning, operation)
  • the information to provide: models, drawings, schedules, data sets
  • the level of information need for each: geometry, alphanumeric data and documentation
  • acceptance criteria: how the client will check it

Management requirements

  • the information standard (naming, classification, units)
  • production methods and procedures
  • the CDE to use and how to exchange information
  • the information protocol and any security requirements

Timing

  • the information delivery milestones, linked to project stages
  • the client's own decision points that depend on the information

How it is used

Tenderers price the EIR and reply with a pre-appointment BEP. After appointment, the EIR becomes part of the contract, and deliveries are checked against its acceptance criteria. A lead appointed party then writes its own, narrower EIR for each subcontractor or consultant it appoints.

Common weaknesses

  • "Provide a BIM model" with no purpose, milestone or format.
  • Everything at every stage: asking for operation-level data at concept design.
  • No acceptance criteria, so nobody can say whether a delivery is complete.
  • A copied EIR that names software, codes or standards the client does not use.
  • Mixing requirements with methods: the EIR says what is needed; how to produce it belongs in the BEP.

Where to read more

ISO 19650-2 lists what the appointing party should establish. National guidance (for example the UK BIM Framework) offers EIR templates and examples to adapt.