LOD / LOIN Matrix
Set the level of development each element must reach at each stage, who is responsible, and what information it must carry. Click a cell; Shift-click to select a range.
Learn the background
Short reads on what this tool is for and how to use it well.
PediaLOD vs LOINLOD grades how developed and reliable an element is; LOIN defines the exact information a purpose needs.PediaLOD levels (100–500) explainedWhat LOD 100, 200, 300, 350, 400 and 500 mean in practice, with a simple example for each.LessonWriting an LOD matrix your team will useShort, specific and owned. A practical way to build an LOD matrix that survives contact with the project.