LOD grades how developed and reliable an element is; LOIN defines the exact information a purpose needs.
Updated 3 November 2026Draft · awaiting review

Two terms are often used interchangeably on projects, but they come from different places and answer different questions.

LOD — level of development

LOD describes how far a model element has been developed and how much others can rely on it. It uses a numbered scale (100, 200, 300, 350, 400, 500). The best-known definitions are in the BIMForum Level of Development Specification. See LOD levels explained.

LOD is easy to communicate — one number per element per stage — which is why LOD matrices are so common.

LOIN — level of information need

LOIN starts with a purpose. For each information requirement it asks:

  • Why is it needed? (purpose)
  • When? (milestone)
  • Who needs it? (actor)
  • What is it about? (object)

It then describes the required information in three groups:

  • Geometrical information — detail, dimensionality, location, appearance, parametric behaviour
  • Alphanumerical information — identification and properties
  • Documentation — drawings, certificates, manuals and so on

LOIN is defined in EN 17412-1, also published as ISO 7817-1, and ISO 19650 refers to it as the way to specify information requirements.

Level of information need: start from the purpose
PurposeWhy is it needed?
MilestoneWhen?
ActorWho needs it?
ObjectWhat is it about?
GeometryDetail, dimension, location
AlphanumericProperties and identity
DocumentationDrawings, certificates

LOIN starts with why, when, who and what — then defines only the information that serves it.

In short

LODLOIN
Starts fromThe elementThe purpose
ExpressesA grade of development and reliabilityThe specific information needed
Covers data?Mostly geometry and reliabilityGeometry, properties and documents
Typical useLOD matrix per stageInformation requirements, IDS files

Using both

They work well together: an LOD matrix sets reliability targets per stage, while LOIN thinking keeps requests specific and avoids over-modelling. Machine-readable checks of LOIN requirements are increasingly written as IDS files.