BCF (BIM Collaboration Format) is an open standard from buildingSMART International for exchanging issues about models between different software. Instead of sending a screenshot and a description, you send an issue that opens at exactly the right place in the model.
What a BCF topic contains
- a title, description, type, status, priority and assignee
- one or more viewpoints — camera position, visible and selected elements, clipping planes
- snapshots (images)
- comments forming a discussion thread
- references to model elements using their IFC GUIDs
Two ways to exchange
- File-based: topics are packaged in a
.bcfzipfile and sent or uploaded. - API-based: tools connect to a server that holds topics, so everyone sees the same live list.
Version 2.1 is widely supported; version 3.0 refines the format and its API.
Your BIM toolSolibri, Revizto, Navisworks…
.bcfzipTopics, comments, snapshots
Where it fits
BCF is often used for clash issues, design review comments and model-checking results. It works best with IFC, because element IDs are stable across tools.
In a coordination issue log, the View / clash ref column is a good place for the BCF topic ID, so each issue in the minutes can be opened directly in the model.