Georeferencing

Placing a model in its true position on Earth — linking the model’s local coordinates to a real coordinate reference system with an origin, an angle and a scale.
Updated 5 November 2026Draft · awaiting review

Georeferencing links a model's own coordinate system to a real-world coordinate reference system (CRS), so the model sits in its true position, orientation and height. Building models are usually drawn near a local origin for precision; georeferencing records how that local system maps to the survey grid.

At a glance

InputsThe CRS (EPSG codes), a known point in both systems, the rotation to grid north, a scale
In IFCIfcMapConversion and IfcProjectedCRS (IFC 4 and later); IfcSite latitude/longitude in IFC 2x3
In authoring toolsProject base point, survey point and shared coordinates (names vary by software)
Recorded inThe BEP or a georeferencing sheet, agreed with the surveyor

The four values

A 2D georeference needs:

ValueMeaning
Eastings and northingsWhere the model's origin lies on the grid
Orthogonal heightThe height of the model's zero above the vertical datum
RotationThe angle between the model's Y axis and grid north
ScaleUsually 1; differs when model units are converted or a grid scale factor is applied
Checking georeferencing with control points
  1. 1Survey controlGrid E, N, H from the surveyor
  2. 2Same points in the modelModel X, Y, Z
  3. 4Residual checkMillimetres, not metres
  4. 5IfcMapConversionInto the IFC and the BEP

Why it matters

  • Models from different teams line up without manual moves.
  • Site models, surveys, utilities and GIS data can be combined.
  • Setting out on site uses the same coordinates as the design.
  • Infrastructure projects, which span kilometres, cannot work without it.

Checking a georeference

A georeference is checked against control points: points known by survey and modelled in the model. Each point gives a residual, the difference between where the model puts it and where the survey says it is. Two points always fit perfectly, so at least three are needed to reveal an error.

Common mistakes

  • Moving the model to the survey coordinates instead of recording a transformation, which loses precision far from the origin.
  • Confusing true north and grid north, often by the grid convergence angle.
  • No vertical datum, or a height relative to finished floor instead of the datum.
  • Each team georeferencing on its own, so the models disagree by a few millimetres that become centimetres on site.
  • Exporting without the map conversion, so the IFC file arrives at the local origin.

Where to read more

buildingSMART's guidance on georeferencing in IFC explains IfcMapConversion. The surveyor's control report and the project's coordinate strategy give the actual values.