Project base point

The point in an authoring model that serves as its local origin for design coordinates.
Updated 5 November 2026Draft · awaiting review

The project base point (a Revit term; similar ideas exist in other tools) marks the model's own reference point, often at a grid intersection. Design coordinates are measured from it.

Together with the survey point and shared coordinates it records how the model relates to the real-world grid. It should be set once, from the agreed coordinate strategy, and not moved afterwards.