The general contractor

The general (main) contractor turns the design into a building: plans the work, buys it in packages, manages the site and the subcontractors, and carries the risk of building it on time and on price. Their teams use the model differently from designers.

2 min read3 quiz questions
Skip to the quiz
  • Watch out
  • What it costs
  • Experienced readers
  • Remember
  • In BIMpedia
Kaisite manager
Even if you do this every day, watch for this: Contractors buy the building in packages, so they need information split the way the packages are let. A model that's coordinated as a whole but can't be filtered by package, zone and level is hard for a contractor to use, however good it looks.

The general contractor (main contractor) is responsible for building the project: it plans the work, buys it in packages from subcontractors, runs the site, manages health and safety, and carries the risk of delivering on time and on price. For a coordinator, the contractor's needs are practical: what's approved, what's in each package, and what's coming next week.

Basics
RoleWhat they doWhat they need from information
Project managerRuns the contract, programme and costStatus, change, risk
PlannerProgramme, sequence, logistics4D, zones, quantities
Commercial manager / QSPackage costs, valuations, changeQuantities by package
Design managerCoordinates design and subcontractor designIssues, approvals, model status
Package managerProcures and manages subcontractsPackage scopes and interfaces
Site manager / superintendentRuns the works dailyApproved information by area

What contractors need from the model

  • Package scopes: elements and quantities filterable by package, so each subcontract is clear.
  • Zones and levels that match how the work is sequenced.
  • Clear status: what's approved for construction and what's still changing.
  • Interfaces between packages: where one trade ends and the next begins.
Story · The package that fell between two trades
How it goes wrong

The fire-stopping around services is in neither the drylining package nor the MEP packages; each subcontractor assumes the other does it. At inspection, hundreds of penetrations are open, and the building control sign-off slips by a month.

How it goes right

The package manager uses the model to list every service penetration through fire-rated walls, assigns fire-stopping explicitly to one package, and attaches the list to the subcontract. Inspections pass the first time.

Kaisite manager
Your turn. Give it about 10 min and work it out on your own before you open the model answer: that is where it sticks.
Exercise: Spot the interfaces 10 min

A school's packages are: groundworks, steel frame, roofing, curtain wall, MEP, drylining and ceilings. List three interfaces between packages where scope gaps often happen, and how the model can help.

Key takeaways

  • The main contractor plans, procures, builds and coordinates the works, through a team of project managers, planners, QSs, engineers and site managers.
  • Work is bought in packages (groundworks, frame, envelope, MEP, fit-out), each with its own subcontractor.
  • Contractors use models for planning, logistics, quantities, package scopes, coordination of trades and site queries.
  • They need information split by package, zone and level, with clear status: what's approved to build.

Your notes

Related tool

Play the programme on the IFC model: see it built day by day, find late work and sequence errors.

Open 4D Simulator →

Check yourself

3 questions · 2 right to complete
  1. 1. What does a main contractor's package manager need most from the model?
  2. 2. Why do contractors care so much about a drawing's status?
  3. 3. Which contractor role is usually in charge of the day-to-day running of the site?
0 of 3 answered