Chapter 2 recap

Ground and place

The key takeaways from this chapter’s 2 lessons.

Survey and reality capture

  • Surveyors provide control points, topographic and measured building surveys, point clouds and set-out on site.
  • Every survey comes with an accuracy, a date and a coordinate system: record all three.
  • Scan-to-BIM models the scanned geometry; the modelled accuracy can't be better than the scan's.
  • On site, surveyors set out the building from the model and check what was built against it.

GIS for BIM people

  • GIS manages places and networks (land, utilities, roads, assets) as map layers with attributes, at city and regional scale.
  • It always works in a coordinate reference system; BIM often uses a local origin linked to one.
  • BIM and GIS meet in site selection, utility coordination, infrastructure and owners' asset management.
  • The link is the coordinate reference system and shared identifiers, not copying geometry between tools.