Health and safety with the model

How can the model help people build, maintain and change the building safely?

Designers decide most of the risks, the programme decides when people are exposed to them, and the handover decides whether future workers know. The model connects all three: see hazards in 3D, check the sequence in 4D, and attach what's left to the assets.

How it works

The process, at a glance

How a programme is linked to a model
  1. 1Agree the breakdownLevels, zones, pours and work packages
  2. 2Code the programmeEach activity gets a code: L03-Z1-FRAME
  3. 3Code the modelElements carry level, zone and package properties
  4. 4Link by rulesActivity ↔ elements with matching codes
  5. 5Play and checkLogic, workspaces, logistics, every update
Asset information, from requirement to handover
  1. 1Asset requirementsWhat operations needs
  2. 3Data in the modelsFilled as design develops
  3. 4COBie exportSpreadsheet or IFC
Tomhealth and safety advisor
The one I see most often on real projects: writing a warning on a drawing where the hazard could have been designed out. Tick off the checklist as you put each thing in place.

Common mistakes

What goes wrong most often on real projects.

  • Writing a warning on a drawing where the hazard could have been designed out.
  • Design risk registers that stop at construction and forget maintenance.
  • Never looking at the 4D model for stacked work, lifts over people or open edges.
  • Handing over safety information as one huge PDF nobody opens when the work is planned.

Is it in place on your project?

Tick what is done — it counts towards the checkpoint on your learning path.

0 / 4 in place