What architects do, and need from you

The architect leads the spatial design and usually the design team. Their model is the reference for spaces, levels and the building envelope, and they need coordination results they can turn into design decisions.

With Maya, information manager3 min read3 quiz questions
Skip to the quiz
  • Watch out
  • What it costs
  • Experienced readers
  • Remember
  • In BIMpedia
Mayainformation manager
Even if you do this every day, watch for this: The architect's model is usually the spatial reference (levels, grids, rooms), not the 'master' for everything. Copying their walls into your model 'to save time' makes two owners for one element and guarantees they'll disagree.

The architect turns the client's brief into spaces people can use. On most building projects they also lead the design team: they chair design meetings, set the design programme and coordinate the engineers. For the BIM coordinator, their model is the spatial reference everyone else builds on.

Basics
The architect usually ownsEveryone else uses it for
Levels and gridsTheir own models, set out from the same references
Spaces and rooms (names, numbers, areas)MEP design, room data sheets, FM, signage
Walls, doors, windows, curtain wall, roofsCoordination, fire strategy, quantities
Finishes and ceilingsServices zones, quantities, maintenance

What architects need from you

  • Coordination results as design decisions. "The duct clashes with the ceiling" is a problem; "lower the ceiling 50 mm in corridor C, or move the duct to the riser side" is a decision they can make.
  • Clear rules before they start: project levels, coordinates, naming, classification, and what properties rooms and doors must carry.
  • Respect for their ownership. Don't copy or edit their elements in other models; reference them.
  • Notice of what changes downstream: room numbers, door marks and level names feed schedules, FM and signage.
Story · The ceiling that kept moving
How it goes wrong

Every week the coordinator sends the architect 300 duct-ceiling clashes. The architect lowers ceilings to make them go away; the client's height requirement is breached on three floors, found at the stage 4 review.

How it goes right

The coordinator groups the clashes into four zones and brings them to the design meeting with the options and the minimum heights from the brief. The architect and MEP engineer agree a bulkhead in two corridors and a reroute elsewhere; the decision is recorded and the ceilings stay compliant.

Hands-on taskCount the windows

Windows are the architect's elements, and the façade engineer and cost manager rely on their count. How many windows (IfcWindow) does the clinic have?

Open the clinic in the IFC Inspector
Mayainformation manager
Your turn. Give it about 10 min and work it out on your own before you open the model answer: that is where it sticks.
Exercise: Who decides? 10 min

For each issue, say whether the architect is the right decision-maker, and what you'd bring to them.

  1. A structural column lands in the middle of a corridor.
  2. A pipe clashes with another pipe in a riser.
  3. The room schedule has two rooms numbered 2.14.

Key takeaways

  • The architect owns spaces, the envelope, finishes, doors and windows, and usually the levels and grids everyone uses.
  • They often lead the design team and chair design coordination.
  • They need issues framed as design choices (move, resize, reroute), with drawings and model views, not raw clash lists.
  • Room data (names, numbers, areas, finishes) starts in their model and flows to FM and handover.

Your notes

Related tool

Define which disciplines are tested against each other, with tolerances, priorities and owners.

Open Clash Test Matrix →

Check yourself

3 questions · 2 right to complete
  1. 1. Which elements does the architect usually own in the federated model?
  2. 2. The architect renumbers all rooms at stage 4. Why does it matter to you?
  3. 3. How should you present a clash between a duct and a ceiling to the architect?