Quality management is how a company makes sure its work meets requirements, every time, not just when someone senior checks. Most design and construction firms run a quality management system, often certified to ISO 9001: written procedures, planned checks, records, audits and continual improvement. Information work fits right into it.
| Quality assurance (QA) | Quality control (QC) | |
|---|---|---|
| Aim | Prevent defects | Find defects |
| Examples in BIM | Templates, standards, training, the BEP, mobilisation tests | Model checks, IDS checks, naming checks, clash tests, reviews |
| When | Before and during the work | After the work, before it's shared |
Information quality in practice
- Checks before sharing: naming, status, coordinates, required properties (IDS), clashes within the discipline.
- Records: what was checked, by whom, with what result.
- Non-conformances: when a delivery fails a requirement, record it, fix it, and ask why it happened.
- Improvement: fix causes in templates, procedures and training.
Every week the coordinator corrects 30 file names from the same subcontractor. After six months the errors are still there; the coordinator is the quality system.
The coordinator raises a non-conformance, finds the cause (the subcontractor's office template uses its own naming), gives them the project template and adds a naming check at upload. The errors stop within two weeks.
Sort these into QA (prevention) or QC (checking): (1) a project template with levels and naming; (2) running the IDS check before sharing; (3) a mobilisation test exchange; (4) a weekly clash test; (5) training new modellers on the BEP; (6) an NCR for missing door data.
Key takeaways
- Quality assurance (QA) is the planned system that prevents defects; quality control (QC) is the checking that finds them.
- Many firms run a quality management system (often to ISO 9001) with procedures, checks, records and audits.
- Model checks, IDS checks and naming validation are QC for information; templates, training and procedures are QA.
- Non-conformances are recorded, fixed, and analysed so the cause is removed.