Skip to content
BIMpedia
Chapter 4 · Lesson 2 of 3Topic: Designing with the model

Embodied carbon from the model

Embodied carbon is quantities times carbon factors. The model gives the quantities; you make sure they're the right ones, mapped to the right materials, at a stage when the answer can still change the design.

With Nadia, architect and design lead2 min read3 quiz questions
Skip to the quiz
  • Watch out
  • What it costs
  • Experienced readers
  • Remember
  • In BIMpedia
Nadiaarchitect and design lead
Even if you do this every day, watch for this: Material names decide the answer. A model with 'Default' or 'Generic' materials gives a carbon figure that looks precise and isn't. Map materials before you count.

Embodied carbon is the greenhouse gas emitted to make, transport, install, maintain and eventually dispose of a building's materials. It is measured in kilograms of carbon dioxide equivalent (kgCO₂e). For many new buildings it is as large as the carbon from decades of operation, and almost all of it is fixed by design decisions: frame, foundations, façade.

Basics

The calculation is simple: for each material, multiply its quantity (m³, m², tonnes) by its carbon factor (kgCO₂e per unit), then add them up. Factors come from environmental product declarations (EPDs) for specific products, or from generic databases. The model supplies the quantities.

Story · The precise figure that came too late
How it goes wrong

At stage 4 the sustainability consultant asks for an embodied carbon figure. The model is detailed, but a third of its elements have generic materials. After two weeks of mapping, the figure is 20% over the client's target. The frame is already designed and coordinated; all that can change is the finishes.

How it goes right

At concept, the design team compares a concrete frame and a timber hybrid with rough quantities from massing models. The hybrid saves a third of the frame's carbon. The choice is made then, and materials are named properly from the start, so each later stage's figure comes from the model in a day.

From model to carbon figure

StepWhat to check
ScopeWhich elements (frame, foundations, envelope, finishes, services) and which life stages
QuantitiesTaken by material, in the units the factors use
MaterialsEvery element has a real material, no "Default" or "Generic"
FactorsEach material mapped to a factor, with its source
ResultTotal and breakdown by element group, with the model version
Nadiaarchitect and design lead
Your turn. Give it about 10 min and work it out on your own before you open the model answer: that is where it sticks.
Exercise: A first carbon figure 10 min

The clinic's frame has 400 m³ of concrete (300 kgCO₂e/m³) and 40 t of reinforcing steel (1,200 kgCO₂e/t).

Check yourself

Carbon of the frame

400 m³ of concrete at 300 kgCO₂e/m³ and 40 t of reinforcing steel at 1,200 kgCO₂e/t. What is the frame’s embodied carbon, in tonnes CO₂e?

tCO₂e

Key takeaways

  • Embodied carbon = quantity of each material × its carbon factor, summed over the building.
  • The model's quantities are only useful if each element has a material that maps to a factor.
  • Early, rough figures change designs; late, precise figures only report them.
  • Always state the scope (which elements, which life stages) and the source of the factors.

Your notes

Related tool

Quantities and costs on the 3D model: colour by cost, find what can't be measured, see each revision's change and when the money is spent.

Open Quantity Take-off and 5D →

Check yourself

3 questions · 2 right to complete
  1. 1. A frame uses 400 m³ of concrete with a carbon factor of 300 kgCO₂e/m³. What is its embodied carbon?
  2. 2. Half the model's walls have the material 'Default'. What happens to the carbon estimate?
  3. 3. When does an embodied carbon estimate change the design most?
0 of 3 answered
Next lessonDesign options and fixity
Was this page useful?