Design options and fixity

Options are cheap in a model and expensive in a federated one. Keep options out of shared models, say what is fixed at each stage, and let the others build on what won't move.

With Nadia, architect and design lead2 min read3 quiz questions
Skip to the quiz
  • Watch out
  • What it costs
  • Experienced readers
  • Remember
  • In BIMpedia
Nadiaarchitect and design lead
Even if you do this every day, watch for this: Unnamed options in a shared model look like design. If an option must be shared, put it in its own file with the option in the name, and never at status 'shared for coordination'.

A model makes it easy to try options: two staircases, three façade rhythms, four plant room layouts. That is one of its strengths. The trouble starts when options leave the designer's desk. Other teams can't tell an option from the design; they coordinate against it, route around it and price it. And when nothing is ever declared settled, nobody can build on anyone else's work.

Basics

In a CDE, work in progress belongs to the team that is developing it. Shared information is for others to use. Options are work in progress; a shared model should hold the design as it currently stands.

Story · Two staircases in one model
How it goes wrong

The architect keeps two staircase options in the main model, one over the other, and shares it for coordination. The MEP engineer routes a duct around both; the structural engineer sizes trimmers for both openings. Two weeks later the architect picks option B, and half of everyone's work on option A is thrown away.

How it goes right

The architect explores both options in their own work in progress, compares them with the structural engineer at a short meeting, and shares only option B. At the end of the stage, the design team publishes a one-page fixity list: grid, levels, cores and risers fixed; partitions and ceilings may still move.

Saying what is fixed

Stage (typical)Usually fixedStill moving
ConceptSite, massing, number of storeysAlmost everything else
Spatial coordinationGrid, levels, cores, risers, plant room sizesPartitions, ceiling layouts, services routes in detail
Technical designStructure, main services routes, façadeFixtures, final sizes within tolerance
Nadiaarchitect and design lead
Your turn. Give it about 10 min and work it out on your own before you open the model answer: that is where it sticks.
Exercise: Fixed or still moving? 10 min

At the end of spatial coordination, sort these items.

Check yourself

Fixed or still moving?

End of spatial coordination. Sort each item.

  • Structural grid
  • Floor levels
  • Main cores and risers
  • Plant room size
  • Partition positions inside the floor plate
  • Ceiling grid layout

Key takeaways

  • Explore options in your own work-in-progress; share only the chosen option, or each option clearly named.
  • At each stage, say what is fixed (grid, levels, cores) and what may still move.
  • Others can build on fixed information; they should only follow moving information.
  • A change to something declared fixed is a formal change, logged and communicated.

Your notes

Check yourself

3 questions · 2 right to complete
  1. 1. The architect shares a model with two staircase options overlapping in the same place. What goes wrong first?
  2. 2. At the end of stage 3, which is a sensible 'fixed' list for other teams to build on?
  3. 3. The structural engineer needs to move a core that was declared fixed. What should happen?
0 of 3 answered