Skip to content
BIMpedia
Chapter 3 · Lesson 1 of 2Topic: Reading drawings

Drawings against the model

Drawings are exported from the model, then often edited by hand: a dimension overridden, a tag typed, a wall drawn with lines, a room renamed. Each edit makes the sheet say something the model doesn't. Finding those differences before they reach site is one of a coordinator's most useful checks.

With Omar, BIM coordinator3 min read3 quiz questions
Skip to the quiz
  • Watch out
  • What it costs
  • Experienced readers
  • Remember
  • In BIMpedia
OmarBIM coordinator
Even if you do this every day, watch for this: Anything typed onto a sheet can drift from the model; anything read from the model can't. When you check a set, look first at the text that was typed: overridden dimensions, hand-written tags and areas, 2D lines standing in for elements.

On most projects the model and the drawings are meant to be one thing seen two ways. In practice, sheets are edited after export: a dimension is overridden to "look right", a fire rating is typed into a tag, a room is renamed on the plan, a wall is drawn with lines because it was quicker. Each edit is small. Together they create a set that says something the model doesn't, and site builds from the set.

Basics
EditWhat it looks likeWhy it's risky
Overridden dimensionA dimension whose text was typed overThe number no longer measures anything
Typed tag or areaText that looks like a tagIt won't update when the model changes
2D linesA "wall" or "duct" drawn as linesMissing from schedules, quantities and clashes
Renamed on the sheetRoom name changed in a text boxRoom data, signage and FM follow the model
Old revisionSheet printed from an earlier modelEverything on it may have moved since

How to check

  1. Revision first. Compare the sheet's revision and status with the CDE. An old sheet makes every other check pointless.
  2. Typed text. Look for dimensions, tags, areas and notes that were typed rather than read from the model. Many authoring tools can highlight overridden dimensions and text-only tags.
  3. 2D content. Look for linework standing in for elements: walls, openings, equipment, fire stopping.
  4. Names and numbers. Compare room names and numbers, door numbers and fire ratings with the model's properties.
  5. Raise, don't fix. Record each difference as an issue to the author, with the sheet, the revision and the model value.

Try it: find what was edited by hand

Playground · Drawings
Find where the drawing and the model disagree

A level 1 plan of a small clinic wing as it was issued, and what the model holds. Some things on the sheet were edited by hand after it was exported. Click every place where the drawing says something different from the model. (A teaching sheet drawn for BIMpedia.)

CLINIC, LEVEL 1General arrangement planLEGENDWall (model)Ceiling bulkheadFD30 / FD60 Fire door rating1.01 Room numberScale 1:100 @ A1Drawn AB · Checked CDBC36001.01 Waiting · 22.4 m²1.02 Consult 11.03 Treat1.04 Consult 2 · 16.8 m²1.05 StoreNote: ceiling 2700 throughoutD03 [FD60]D07 ⟷ 900Rev P03 · Status S2Sheet A-101
0 of 6 found. Compare each item on the sheet with the model column below.
On the sheetIn the modelYour check
Room 1.01 Waiting · 22.4 m²IfcSpace 1.01 Waiting, area 24.0 m²Not marked
Room 1.04 Consult 2 · 16.8 m²IfcSpace 1.04 Consult 2, area 16.8 m²Not marked
Room 1.05 StoreIfcSpace 1.05 Clean utilityNot marked
Grid B–C: 3600Grids B–C 3,600 mm apartNot marked
Door D07: 900 wideDoor D07, overall width 1,000 mmNot marked
Wall between 1.02 and 1.03No wall element thereNot marked
Door D03 tag: FD60Door D03, FireRating EI 30Not marked
Grid line BGrid B at the same positionNot marked
Note: ceiling 2700Ceilings at 2,700 mmNot marked
Title block: Rev P03 · S2CDE: revision P04 shared on 12 MarchNot marked
Story · The fire door that was two doors
How it goes wrong

The general arrangement plan tags a door "FD60". The model's door carries EI 30, because the tag was typed during a late change and never pushed back into the model. The fire strategy review uses the drawings and passes; the door schedule for ordering comes from the model and orders EI 30 doors. The mismatch is found at the fire officer's inspection.

How it goes right

Before issue, the coordinator lists every tag on the fire plans that isn't reading the model. Door D03 shows up. The architect confirms FD60 is right, updates the model, and the tag is replaced with one that reads the property. The schedule and the drawing now come from the same value.

OmarBIM coordinator
Your turn. Give it about 10 min and work it out on your own before you open the model answer: that is where it sticks.
Exercise: Write the drawing check for your next issue 10 min

Your team issues 40 sheets next week. Write a five-line check the authors run before issue, and say who signs it off.

Key takeaways

  • Sheets drift from the model through hand edits: overridden dimensions, typed tags and areas, 2D lines, renamed rooms, old revisions.
  • Annotation that reads the model (tags, schedules, dimensions) stays right; typed text doesn't.
  • The contract says which governs when they disagree; often the issued drawings, sometimes the model.
  • Check typed annotation, 2D-only content and the revision on every issued sheet.

Your notes

Check yourself

3 questions · 2 right to complete
  1. 1. A door dimension on an issued sheet reads 900 while the door in the model is 1,000 wide. What most likely happened?
  2. 2. A wall appears on the plan but is in no schedule, no quantity and no clash report. What is it likely to be?
  3. 3. The issued drawing and the model disagree on a room's use. Who decides which is right?
0 of 3 answered
Was this page useful?