Skip to content
BIMpedia
Chapter 3 recap

When drawings and models disagree

The key takeaways from this chapter’s 2 lessons.

Drawings against the model

  • Sheets drift from the model through hand edits: overridden dimensions, typed tags and areas, 2D lines, renamed rooms, old revisions.
  • Annotation that reads the model (tags, schedules, dimensions) stays right; typed text doesn't.
  • The contract says which governs when they disagree; often the issued drawings, sometimes the model.
  • Check typed annotation, 2D-only content and the revision on every issued sheet.

Revisions and transmittals

  • Each revision gets a code, a date, a description and initials, in the revision table or title block.
  • Clouds and revision triangles mark where the sheet changed in this revision.
  • A transmittal records which revisions were sent to whom, when and for what purpose.
  • Superseded sheets are archived and marked, never left in circulation.