Combined scale factor

The factor that converts distances between a map grid and the ground: grid scale factor times elevation factor. Small per metre, large over a long corridor.
2 min readUpdated 8 November 2026

The combined scale factor converts a distance measured on a map grid into the distance on the ground, and back. It combines the grid scale factor (how much the map projection stretches or shrinks distances at that place) with the elevation factor (the effect of the site's height above the reference ellipsoid). Close to 1, it matters little on a building and a great deal on a long corridor.

At a glance

CombinesGrid scale factor × elevation factor
Ground from gridGround ≈ grid distance ÷ combined scale factor
Typical sizeWithin a few hundred parts per million of 1 on national grids
150 ppm means150 mm per kilometre
Matters mostLong roads, railways, pipelines, large sites

The parts

FactorDepends onEffect
Grid scale factorPosition on the projection (distance from its central line)Grid distances longer or shorter than on the ellipsoid
Elevation factorHeight above the ellipsoidGround distances at height are longer than on the ellipsoid
Combined scale factorBothConverts grid distances to ground distances at the site

How it is used on projects

The project surveyor states the coordinate reference system and the combined scale factor, often by zone along a route. Teams then agree whether design coordinates are grid (in the projected system) or ground (at true size), and the factor is applied consistently: for setting out, for ordering lengths of pipe or rail, and when placing ground-scale models in a grid-based federation. Many long projects define a low-distortion project grid whose factor stays within a few ppm along the whole route, so grid and ground almost coincide.

Variations

  • National grids (for example British National Grid, US State Plane systems) with varying factors across the area.
  • Project grids (low-distortion projections) designed around one scheme.
  • Local engineering grids with scale fixed at 1 near the site, tied to the national grid by a transformation.

Common mistakes

  • One team working in grid, another in ground, without knowing it.
  • Ordering materials from grid lengths on long routes.
  • Applying the factor twice: in the survey software and again in the design tool.
  • Ignoring the elevation factor on high sites.

Where to read more

Your national mapping agency's guidance on its grid (for example the Ordnance Survey's guide to coordinate systems in Great Britain, or NOAA's National Geodetic Survey documentation for State Plane coordinates); the project's survey specification; and the EPSG registry for the parameters of each CRS.