Drawing symbols and legends

The conventions that make a drawing readable: line types, symbols, hatches and abbreviations, defined for each set in its legend.
2 min readUpdated 8 November 2026

Drawing symbols and legends are the conventions a drawing uses to say things without words: line types, symbols, hatches and abbreviations. The legend is the key that defines them for a given set. Two sets can use the same symbol for different things, so the legend of each set is what counts.

At a glance

Line typesContinuous, dashed (hidden), chain (centre and grid lines)
SymbolsNorth point, section and detail marks, door swings, levels, grid bubbles
HatchesMaterials in section: concrete, masonry, earth, insulation
AbbreviationsShort text such as El., Sta., c/c, TYP, NTS
Where definedThe legend sheet, the general notes, or the title sheet

The main conventions

ConventionUsually means
Thick continuous lineCut edge of what is built
Thin continuous lineEdge seen beyond, dimension or leader
Dashed lineHidden, below or behind; sometimes existing to be removed
Chain line (long and short dashes)Centre line or grid line
Section mark (arrow with a reference)Where a section is cut, and the sheet it is drawn on
Detail callout (circle with a reference)A part drawn larger elsewhere
Level symbolA height above the project or survey datum
TYPTypical: applies wherever nothing else is shown
NTSNot to scale

How they are used on projects

Each office and each discipline has its own standard symbols, and many countries publish national drawing conventions. On a project, the information standard or a shared template should fix one legend for the set, so that all teams' sheets read the same way. Model-based drawings produce most symbols automatically from the model; hand-drawn symbols and text are where errors and inconsistencies tend to creep in.

Civil and highway drawings add their own abbreviations for alignments and levels, such as station (Sta.), point of intersection (P.I.), vertical curve (V.C.) and crown of roadway (C/R).

Variations

  • Architectural, structural and services drawings each have their own symbol sets.
  • Imperial and metric sets differ in how scales and levels are written.
  • Historic sets often define abbreviations nowhere: they were common knowledge in the office that drew them.

Common mistakes

  • Assuming a symbol means what it meant on the last project.
  • Reading an abbreviation by guesswork instead of finding the legend, or asking.
  • Measuring a "not to scale" detail.
  • Mixed legends within one set, because teams used their own templates.

Where to read more

National drawing practice standards (for example the ISO 128 series on technical drawing conventions and your country's CAD standards); the project's information standard; and the legend and general notes of the set itself.