Skip to content
BIMpedia

bSDD (buildingSMART Data Dictionary)

An online service from buildingSMART that publishes classifications, properties and their definitions, so requirements and models can refer to shared, unambiguous terms.
Updated 5 November 2026Draft · awaiting review

The buildingSMART Data Dictionary (bSDD) is an online service that hosts classification systems, properties and their definitions from many publishers in one place, with a common structure and an API. Software can look up a class ("external wall") or a property ("thermal transmittance") with its definition, data type, units and allowed values, instead of every project inventing its own.

At a glance

Run bybuildingSMART International
ContainsDictionaries from many publishers: IFC itself, Uniclass, ETIM, national and company dictionaries
AccessWeb search and a public API
Used byAuthoring tools, IDS editors, checkers, product data platforms
Related standardsISO 12006-3 (the data dictionary framework), ISO 23386 and 23387

What a dictionary holds

ConceptExample
ClassFire door, centrifugal pump, a Uniclass product code
PropertyFire resistance, nominal flow rate
Property detailsDefinition, data type, unit, allowed values, IFC mapping
RelationsClass A is a kind of class B; this class maps to IFC entity IfcDoor

Every concept has a stable web address (URI), so models and requirement files can point to it.

How it is used

  • Writing requirements: an IDS can reference bSDD properties and classes, so the meaning of each requirement is fixed.
  • Authoring: plug-ins let modellers pick classifications and properties from bSDD rather than typing them.
  • Product data: manufacturers describe products with the same properties that requirements ask for.
  • Translation: dictionaries can hold names in several languages for the same concept.

Why it matters

Without a shared dictionary, one project's "FireRating" is another's "Fire_Resistance" and a third's "FR (min)". Checks fail, data cannot be combined and every project maps again. Referring to the same definitions removes that friction.

Limits

  • The quality of each dictionary depends on its publisher.
  • Not every authoring tool integrates bSDD yet.
  • Project-specific properties still need definitions; projects can publish their own dictionaries.

Where to read more

Search the bSDD at search.bsdd.buildingsmart.org; buildingSMART's technical documentation describes the API and the data model.

Discussion