Chapter 5 recap
Handover
The key takeaways from this chapter’s 1 lessons.
Asset information at handover
- Start from what the people running the building need: the asset information requirements.
- Put the required attributes in the LOD/LOIN matrix with an owner, so they are filled as the design develops.
- Check the asset data (for example a COBie workbook) at every milestone, not only at the end.
- Blank is better than “n/a” or “TBC” — placeholders hide missing information from every check.