Skip to content
BIMpedia
Chapter 4 recap

Files, names and coordinates

The key takeaways from this chapter’s 3 lessons.

Naming information containers

  • Every file, model or drawing is an information container and needs a unique ID that follows the project convention.
  • The ISO 19650 pattern combines fields: project, originator, volume or system, level or location, type, role and number.
  • Each field uses short codes from an agreed list, so names can be checked automatically.
  • Status and revision are metadata in the CDE, not part of the container name.

Shared coordinates and georeferencing

  • Every model has an internal origin; teams must agree how their models relate to each other and to the site.
  • Georeferencing links the model to a projected coordinate reference system, identified by an EPSG code.
  • A rotation and a translation (and sometimes a scale) describe how model coordinates map to grid coordinates.
  • Check the result with surveyed control points: small residuals mean the model is where it should be.

Checking an IFC file before you share it

  • Check the header: schema version, exporting application and view definition.
  • Check the spatial structure: project, site, building and the expected storeys, with elements assigned to them.
  • Watch for proxies, unnamed elements and elements outside the spatial structure — they usually point to export mapping problems.
  • Check that required properties are present and filled, ideally against an agreed list or IDS file.